Saturday, July 25, 2015

Thursday, July 2, 2015

Day 148 Update

There wasn't tons of work done at this house this week, but I got several things confirmed so we'll be ready to go when the rain moves out.


  • Concrete in garage was poured
  • Apron, back patio, and front sidewalk were prepped.  We're using a stamped and stained concrete for those areas as well as the front porch and covered back porch.
  • Picked out a Chesapeke dry stacked stone veneer for the interior and exterior fireplaces and interior columns.
  • Ordered garage doors
  • Tile in master bath shower was finished
  • Faucets were finalized
  • Chose trim, soffet, and gutter colors
Some of the built-ins should be in this week or beginning of next.  I'm excited to see them.  And HVAC will be installed next week. 

I never asked because I didn't want to get hung up on a date, but builder says we're about 6 weeks away.  Yay!