Garage doors are in and columns are being built.
Saturday, July 25, 2015
Thursday, July 2, 2015
Day 148 Update
There wasn't tons of work done at this house this week, but I got several things confirmed so we'll be ready to go when the rain moves out.
- Concrete in garage was poured
- Apron, back patio, and front sidewalk were prepped. We're using a stamped and stained concrete for those areas as well as the front porch and covered back porch.
- Picked out a Chesapeke dry stacked stone veneer for the interior and exterior fireplaces and interior columns.
- Ordered garage doors
- Tile in master bath shower was finished
- Faucets were finalized
- Chose trim, soffet, and gutter colors
Some of the built-ins should be in this week or beginning of next. I'm excited to see them. And HVAC will be installed next week.
I never asked because I didn't want to get hung up on a date, but builder says we're about 6 weeks away. Yay!